Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Friday, 18th of May 2012
IPE Logo
 ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.atlascopco.co.uk/ukus/?utm_source=IPE&utm_medium=online&utm_content=profile&utm_campaign=Annual



Click to visit www.maintenanceuk-expo.com

Click to visit sponsors web site

Click to visit http://www.atlascopco.co.uk/ukus/?utm_source=IPE&utm_medium=online&utm_content=profile&utm_campaign=Annual

Click to visit http://www.domnickhunter.com/

Click to visit sponsors web site

Boiler load optimiser demonstration
July 1st 2011

Sabien Technology will feature a live demonstration of its M2G intelligent boiler load optimiser, working with a boiler and BMS on the stand to demonstrate how significant energy savings are achieved by preventing dry cycling.

Boiler dry cycling is caused when boilers fire to compensate for standing heat losses from the boiler without actively contributing to the building's heating load, even when the plant is linked to a BMS or BEMS.

Sabien Technology's M2G intelligent boiler load optimisation is able to recognise and identify dry cycling and consistently achieves energy savings of between 10% and 25% in a wide range of old and new boilers, integrating with and complementing other control systems. Stand 2844

More articles from Sabien Technology Limited: