Under control March 1st 2009 Babcock Wanson's BW72H steam
boiler control system offers users 72h
fully approved, unattended operation
and 30 days uninterrupted steaming
along with enhanced system
monitoring and security. Daily boiler
water level control checks are
replaced by a simple 15min test every
72h, which can be completed
without stopping the boiler.
This avoids interference with
normal operational/production
requirements and the weekly boiler
water level control mandatory
evaporation test is replaced with a
monthly test, offering a reduction in
manning and operational costs. More articles from Babcock Wanson UK Ltd: |