Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Sunday, 05th of July 2009
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://198.170.88.123/advmail/atlasCopco/healthcheck/index.html

What next?
 Request further Information    visit web site     Send to friend
 ABB Ltd company's profile
Click here to visit 
sponsor's 
website


Click to visit sponsors web site

Click to visit http://198.170.88.123/advmail/atlasCopco/6302_completecare_03-09/compcare03-09.html

Click to visit http://www.domnickhunter.com/



Click to visit http://www.theenergyevent.com/



Click to visit http://www.theenergyevent.com/

Click to visit http://www.healthandsafetyevents.co.uk

Click to visit sponsors web site




Click here for the latest compressed air news !

Northern Foods cuts air costs
January 1st 2008

Northern Foods is saving almost £2500 annually on its compressed air system since installing an ABB variable speed drive at its Riverside Bakery in Nottingham. The 45kW drive was supplied by Inverter Drive Systems (IDS), an ABB Drives Alliance member.

IDS carried out an energy appraisal of Northern Foods' compressed air system and recommended the use of a 45kW ABB standard drive.

There are three compressors in total, two 30kW fixed-speed assist compressors and a 45kW duty compressor. The drive was fitted on the latter, which is in operation all the time.

One of the fixed speed compressors is used to top up the pressure when demand increases, while the other is on standby.

Zac Dorn of IDS comments "There are always two out of three compressors running so we had to ensure that the fixed-speed assist compressor only came online when the duty compressor with variable speed drive could provide no more air – that is when it is running at full-speed." This was achieved by the installation of a pressure sensor to provide accurate system pressure feedback for the drives built-in PID controller.

Payback on the project is calculated at 1.5 years, achieving an annual saving of £2450.