Space created September 1st 2007 Precision engineering firm, Welded
Presswork (WPW) expects to
double its annual profits after being
supplied with an extra storage unit
from Spaciotempo.
The 300m2 temporary building
has steel reinforced uPVC cavity
walling and double skinned airfilled
roofing system to assist
climate control.
Based on a heavy-duty
aluminium extruded section, which
combines a modern look with
solidity and strength, the unit
provides a clean, safe environment
for the storage of finished goods
and engineering components,
freeing space in WPW's main
manufacturing plant. More articles from Spaciotempo UK Ltd: |