Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Monday, 22nd of March 2010
IPE Logo
 ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.eriks.co.uk/mtd/page3.asp
Click here to visit CGFS's website

Click here to visit DFM Media's website
Click to visit http://www.machinebuildingukshow.com

Click to visit http://www.mtecukshow.com



Click to visit http://www.totalexhibition.com/ipe

Click to visit sponsors web site




Click here for the latest compressed air news !

Safer salad handling
May 1st 2008

Project management, design and solutions integration specialist, FMA, has completed a significant materials handling project for Soleco UK's Florette pre-packed salads production facility.

The company worked with Florette, looking at the way it handled raw materials crates and helping it to reduce health and safety issues previously associated with the working height of pallets.

FMA installed four new lifts and horizontal conveying systems to maximise operator lines and enable 'trimming' staff to access full salad crates at a safe height on a new mezzanine level.

The project, in which most of the work was carried out overnight and at weekends, was a turnkey approach to evacuate empty crates from the salad trimming department to the raw materials department. FMA was responsible for all civils, white walling and electrical installation.

A newly installed pallet lift was designed to allow manual loading of salad crates at ground floor level by operators using electric pallet trucks.

The lift has an automatic stop facility when raised pallets reach the correct working height on the mezzanine.

Once the first layer of crates is used on the pallet, the operator presses the 'up' button for the lift to bring the next layer to the right working height.