New dock lift September 1st 2008 A mobile dock lift from Transdek
UK is proving a fast, cost-effective
solution for loading trailers at a
regional distribution centre opened
by A F Blakemore and Son in the
West Midlands, one of six
wholesalers that supply 700 of the
2700 SPAR convenience stores in
the UK.
The Transdek free-standing dock
lift, which required no civil
engineering work, was ready for
use in 2h and could be moved
between loading bays as required.
The platform measures 3500 by
2450mm wide and has a capacity
of 4500kg, so 16 cages can be
carried at a time and a trailer can
be loaded in 15min. A bridging
plate adjusts for different vehicle
floor heights between 1050mm and
1400mm, including powered
double-deck trailers. More articles from Transdek UK Ltd: |