Helping Tesco to deliver
September 1st 2008

Easilift Loading Systems has supplied loading bay equipment to three new purpose-built Tesco distribution centres at Livingston, Lichfield and Goole, in contracts valued in excess of £9m.

At Livingston, it supplied bespoke exterior modular dock leveller pods for 162 of the 179 loading bays. The free-standing pods were installed on the outside of the bays, avoiding the loss of internal floor area and providing an insulated, hygienic, weatherproof area.

Each pod is fitted with swing lip type Power Ramp dock levellers and insulated electrically-operated sectional overhead PowerDoors.

Collapsible-type PowerShelters are fitted to 108 bays, with inflatable versions to accommodate doubledeck trailers for the remainder.

A further 17 scissor lift dock pods, designed to integrate with Tesco fixed bed double-deck trailers, are equipped with scissor lifts. They are capable of carrying 36 roll cages and an operator safely between the two fixed vehicle beds and the loading dock.

The re-levelling feature continually repositions the platform within 3mm of the preset dock height throughout the loading and unloading process, ensuring that cages can be safely rolled between the platform and the warehouse floor at all times.

Loading bays at all three distribution centres have Easilift integrated control panels, traffic lights and dock lights, with insulated sectional overhead doors provided for vehicle maintenance units and trailer wheel guides for goods in bays.

More articles from Easilift Loading Systems Ltd: