Loading bays installation November 1st 2006 Stertil Stokvis has recently completed a distribution centre installation for Multipart Supply Chain Solutions. Multipart has invested £20 million in the site. The Stertil installation will allow around 25 deliveries and 10 despatches to be made from the distribution centre each day. Stertil products used include a swing-lip dock leveller, wheel guide, collapsible dock shelter and a Thermadoor insulated sectional overhead door for each loading bay as well as two level access doors, eight fire exit doors and three RapidRoll 660 doors inside. More articles from Stertil UK Ltd: |