Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Sunday, 05th of July 2009
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.eriks.co.uk/mtd/index.asp
Click here to visit 
sponsor's 
website




Click to visit sponsors web site

Click to visit http://www.theenergyevent.com/

Click to visit http://www.healthandsafetyevents.co.uk




Click here for the latest compressed air news !

Relocatable and quick to erect
March 1st 2007

When the Transdevelopment Group required an automotive processing warehouse for one of its clients it turned to Rubb Buildings to provide a structure to house imported cars and create a workshop for the vehicles.

Working closely with the company, Rubb constructed a 21.37m by 52.5m BVE building with 6m sidewalls. It comprises a galvanised steel frame with a high strength PVC-coated polyester translucent membrane and post production hot dip galvanising of all welded components.

The structure can be extended easily if further space is required in the future. Frame-supported membrane structures are also relocatable.

Access is via standard doors around the facility; the main vehicle entrance is at the front gable end.

Use of a white, semi-translucent roof fabric provides a bright interior and contributes to a safe working environment.

Rubb provided a turnkey service that included site foundations, electrical work, lighting and inclusion of an exhaust fan system.

More articles from Rubb Buildings Limited: