Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Sunday, 07th of September 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Click to visit http://www.igus.co.uk



Get your free copy today!


In association with
Igus

Register for our ENewsletter
Click to visit sponsors web site

Click to visit sponsors web site

Click to visit sponsors web site

Click to visit http://air.irco.com/uk/

Click to visit sponsors web site

Click to visit sponsors web site

Click here to visit the Energy Event website



Click here for the latest compressed air news !

Relocatable and quick to erect
March 1st 2007

When the Transdevelopment Group required an automotive processing warehouse for one of its clients it turned to Rubb Buildings to provide a structure to house imported cars and create a workshop for the vehicles.

Working closely with the company, Rubb constructed a 21.37m by 52.5m BVE building with 6m sidewalls. It comprises a galvanised steel frame with a high strength PVC-coated polyester translucent membrane and post production hot dip galvanising of all welded components.

The structure can be extended easily if further space is required in the future. Frame-supported membrane structures are also relocatable.

Access is via standard doors around the facility; the main vehicle entrance is at the front gable end.

Use of a white, semi-translucent roof fabric provides a bright interior and contributes to a safe working environment.

Rubb provided a turnkey service that included site foundations, electrical work, lighting and inclusion of an exhaust fan system.

More articles from Rubb Buildings Limited: