Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Thursday, 24th of May 2012
IPE Logo
 ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://motordemo.eriks.co.uk/control_main_form/control_main_form.php

Click to visit sponsors web site

Click to visit www.maintenanceuk-expo.com



Click to visit sponsors web site

Creating a lab
March 1st 2010

Troax UK has supplied its double skin, steel Excalibur partitioning to create a calibration laboratory at the New and Renewable Energy Centre in Hebburn, Tyne and Wear.

The laboratory, sited within a 140m high testing hall, was built by Aaran Design using Troax's modular steel partitioning. Solid steel Excalibur panels reach a height of 5m and have been installed together with a solid steel ceiling, also supplied by Troax. A specialist contractor fitted a Faraday Cage to the structure to earth every component within it. Doors reach a height of 3.25m, providing access for both staff and large items of electrical equipment.

Excalibur's two steel skins are of monobloc construction and separated by a composite insulating infill that complies with all relevant health and safety legislation. The design ensures good sound and heat insulation and provides 30min fire rating.

More articles from Lee Manufacturing Limited (TROAX Group):