Floor deal on sche

In January 2009 Deal Distribution
asked FACE Middle East Fzc to
design the floor in its proposed VNA
extension.With a racking top beam
height of 11.7m, floor flatness was
critical and the decision was made
that in order

In January 2009 Deal Distribution
asked FACE Middle East Fzc to
design the floor in its proposed VNA
extension.With a racking top beam
height of 11.7m, floor flatness was
critical and the decision was made
that in order to satisfy the tight
project schedules, the 3600m2 floor
would be constructed using a Laser
Screed and then Laser Ground
within the aisles where necessary.

Once the design was finalised, the
Concrete Grinding team spent three
days preparing the sub-base.Within
this time, the concrete mix design
was tested and MB Mix was chosen
to supply the concrete for the
project. Once the levelling and
compacting operations were
completed, the concrete was ordered
and floor construction began. Over
three days, 1200m2 of floor was
constructed each day. The finished
floor levels were carefully monitored
throughout construction and each
slab was surveyed the day after
casting for immediate feedback.