Compressors cut energy bills for vernacare
Thorite has supplied and installed two compressors at Bolton-based human waste management specialist, Vernacare. The compressors offer a combination of reliability and energy-saving characteristics and comprise an HPC 90kW fixed speed CSDX162, and HPC 110kW variable speed model, DSD202.

Thorite has supplied and
installed two compressors at
Bolton-based human waste
management specialist,
Vernacare. The compressors
offer a combination of
reliability and energy-saving
characteristics and comprise
an HPC 90kW fixed speed
CSDX162, and HPC 110kW
variable speed model, DSD202.
Located in the main
production plant, the
machines are currently
saving Vernacare over 6% in
energy use while providing
trouble-free performance.
Graeme Topping,
Vernacare’s engineering
manager said: “The new HPC
compressors have performed
superbly and achieved
significant energy savings.
We are now benefiting from
lower energy bills, reduced
service costs and outstanding
machine reliability. Having
agreed a 5 year ‘total care’
service contract I’m sure this
situation is set to continue.”