Faced with a pressing need to replace its unreliable and noisy cooling tower, Kent-based plastics manufacturer SK Engineering contacted AB Systems who – within hours – delivered an intelligent, two-stage cooling solution.

This included a temporary hire chiller to meet the client’s immediate needs, and a bespoke, long-term solution to achieve impressive gains in both system performance and efficiency.
Nearing the end of its service life, the cooling tower, located near to the residential side of the industrial estate, was becoming increasingly uneconomical to run. It was also incurring mounting maintenance and water treatment costs, and becoming more susceptible to component failure. Noise levels too were rising.
Simon Kinnaird, managing director of SK Engineering, explained: “AB Systems acted extremely quickly. They were on site to assess our requirements within 24 hours and provided a solution almost overnight. The speed of their service meant that we didn’t have to stop production at all.”
Following a full analysis of SK Engineering’s existing cooling system, AB Systems removed the cooling tower by crane and installed a temporary hire chiller to ensure continual operation of the manufacturing process. Subsequently, AB Systems developed a permanent cooling solution that was able to meet the plant’s cooling requirements, satisfy noise restrictions and improve system efficiency, all within the client’s budget.
AB Systems recommended the Nova Friggo RC 120 air-condensed chiller with a pump tank module for the project. Specifically designed for internal installation, the RC 120 chiller has radial fans rather than the axial fans standard to most chillers, thereby enabling ductwork to be connected. The result is an economical solution to noise reduction. In addition, the pump and tank module allows the system to be easily expanded in the future.
The RC 120 chiller also offers energy efficiency, consuming minimal power due to its high quality construction. Features include high efficiency heat exchangers, which enable the compressor to maximise the cooling capacity, and a Nova Frigo microprocessor, which ensures stability and precision of the process temperature and balanced operation of the compressors, both of which are said to lead to higher energy savings.
AB Systems connected the pump tank module to the chiller and the plant’s existing pipework via a new pipework manifold system, with provision to connect further pipework and chillers as the system is integrated into the whole factory.
Kinnaird adds: “AB Systems’ provided a turnkey solution and planned everything meticulously so that there was only one very short pre-planned production downtime during the entire project.” And the benefits didn’t stop there: “What was most impressive is that we saw an immediate increase in productivity. It’s improved the performance and efficiency of our process significantly,” he said. “We’ll be working with AB Systems again soon on our pipework.”