Racking system optimises work space
A racking installation
designed to maximise storage
capacity while minimising
space requirements has been
completed by Pro-Dek for
PWS Worksurfaces.
Pro-Dek was appointed to
install a cantilever racking
system for t

A racking installation
designed to maximise storage
capacity while minimising
space requirements has been
completed by Pro-Dek for
PWS Worksurfaces.
Pro-Dek was appointed to
install a cantilever racking
system for timber worktops
that would take advantage of
the building height in order
to maximise the area
available for production.
The completed installation
has 200m of racking 9.6m
work 24/7 to keep on top of
the game.”
The plastics moulding
company, which carries out
injection and cast moulding
in various materials, supplies
the base and top castings for
Movetech UK’s B200 series as
well as drive wheels for the
Midi,Maxi and MJ21 ranges.
Movetech offers services
which extend from preproject
advice and project
design, through to delivery,
installation, maintenance and
calibration.
high in single-sided and
double-sided runs.With
eight arms fitted throughout,
around 1800 linear metres of
storage has been provided.
The arms are 900mm long
and support loads up to
700kg. They can be adjusted
vertically in increments of
100mm and have a premanufactured
rake of 2
degrees.
A guide rail system bolted
to the front face of the
racking bases allows the
operation of a multidirectional
sideloader and
also helps to reduce the risk
of damage.
IPE publishes a weekly eNewsletter, delivering a carefully chosen selection of the latest stories straight to your inbox.
Subscribe here

