Valves coated for a deep sea project
Weld overlay cladding and fabrication specialist Arc Energy Resources has recently completed the coating of three large Quench Valves for a major offshore oil & gas installation.

The directional quench valves, which weigh approximately three tonnes, were delivered to Arc Energy’s Gloucestershire facility, as pre-machined body castings.
In order to combat the combined erosion and corrosion attack from an aggressive medium, Arc Energy’s welding engineering team advised a 3mm thick coating of Ultimet, a cobalt-chromium alloy which combines corrosion, wear and impact resistance with high tensile strength.
IPE publishes a weekly eNewsletter, delivering a carefully chosen selection of the latest stories straight to your inbox.
Subscribe here

