Model of efficiency
Danlers’ PIR occupancy switches
and electronic time lag switches have
been installed at the head office of
the Games Workshop in Lenton as
part of an overall effort by the
company to improve its energy
efficiency.
Pa
Danlers’ PIR occupancy switches
and electronic time lag switches have
been installed at the head office of
the Games Workshop in Lenton as
part of an overall effort by the
company to improve its energy
efficiency.
Pa
Magnatech has launched a range of
fuel conditioning units suitable for
small commercial and domestic use.
It is reported that Magnatech’s
technology has been verified under
the EU’s TRITECH ETV scheme as
reducing fuel
Power supply manufacturer PULS
UK believes cheap inefficient power
supplies, often used in everyday
household and office electrical
equipment, are wasting energy and
increasing carbon emissions.
A power supply device
The Environment
Agency has become
the latest government
agency to install
voltage power
optimisation and has
signed a contract to
install
powerPerfector units
across 33 sites. The
estimated effect on
these building
As more attention is paid to particulate emissions from
biomass boilers, forthcoming air quality legislation is set to
force a re-think on how we handle these emissions.Kevin
Stones, engineering and service director with H
A recent example of an integrated project
undertaken by WellmanWulff describes
activities at the Shell green site in widnes,
home to the Mersey Valley Processing
centre.
WellmanWulff successfully manufactured
and inst
Designed to assist heating engineers
in the safe installation and servicing of
boilers and combustion systems,
Telegan’s Sprint V range comprises
five instruments in one small,
handheld unit – flue gas analyser,
differe
Visitors to Sabien
Technology’s stand
at Sustainability
Live! (20 to 22
April, NEC) will be
able to find out
more about energy wastage in boiler
plant caused by ‘dry cycling’ (when
boilers fire to compensate for
stan
Wellman Robey Hire Division was
asked by Müller in Market Drayton
to provide a containerised boiler unit
for use while the company’s main
steam plant undergoes annual
inspection and maintenance.
Having supplied the 12
Fulton Boiler Works
has introduced a
sequencing system for
multiple steam and hot
water boiler
installations.ModSync
is designed to maximise
the efficiency of
multiple boiler
installations by
providing precise press
IPE publishes a weekly eNewsletter, delivering a carefully chosen selection of the latest stories straight to your inbox.
Subscribe here