Home>Plant, Process & Control>Pneumatic equipment>Pipes boost hi-speed composting
ARTICLE

Pipes boost hi-speed composting

25 January 2013

As part of modifications to the advanced recycling and composting process for the Premier Advanced Recycling Centre (PARC) at Thornley in County Durham, Jacob has supplied a modular pipework system. The process is capab

As part of modifications to the advanced recycling and composting process for the Premier Advanced Recycling Centre (PARC) at Thornley in County Durham, Jacob has supplied a modular pipework system. The process is capable of diverting up to 85% of household waste from landfill.

Jacob UK engineers worked with the Premier Waste Management team to produce a ducting solution based on Jacob standard 1 to 3mm thick modular pipework system, supplied as galvanised mild steel sections up to 400mm in diameter and connected using silicon seals in a pressure tight connection. Stand A3124
 
OTHER ARTICLES IN THIS SECTION
FEATURED SUPPLIERS
 
 
TWITTER FEED