|
|
Edward Lowton
Editor |
|
| Home> | Handling and Storing | >Lifting equipment | >XMAS tree handling |
ARTICLE
XMAS tree handling
25 January 2013
A J D Neuhaus hydraulicallyoperated crane with 80t lift capacity has been delivered for operation on the semisub rig Spitsbergen, designed and built by Aker Solutions for operation on the Norwegian continental shelf. Th

A J D Neuhaus hydraulicallyoperated
crane with 80t lift capacity
has been delivered for operation on
the semisub rig Spitsbergen,
designed and built by Aker Solutions
for operation on the Norwegian
continental shelf. The rig will be
used to find new oil and gas
resources in the North Sea, and the
JDN crane will be used to transport
'xmas tree' assemblies.
The crane, a double girder overhead travelling design, features a radio control system, together with a rack and pinion drive providing safe power transmission for both crane and hoist travel movements when operating offshore or as vessel mounted units. Simultaneous control of several hoists is provided.
The crane, a double girder overhead travelling design, features a radio control system, together with a rack and pinion drive providing safe power transmission for both crane and hoist travel movements when operating offshore or as vessel mounted units. Simultaneous control of several hoists is provided.
MORE FROM THIS COMPANY
- Offshore role for hoist
- 'Extremes' added
- 270 years of experience
- Centralised control for four hoists
- Versatile crane systems comply with international regulations
- Hoist handles offshore pumps
- Hoists for hazardous environments
- Air operated hoists
- Air operated hoists at work in spray booths
- Explosion proof crane systems
OTHER ARTICLES IN THIS SECTION
















