|
|
Edward Lowton
Editor |
|
ARTICLE
Savings for Tata Steel
26 January 2014
A fume extraction system at Tata Steel’s Aldwarke melting shop, in Rotherham is reported to be saving £570,000 a year on energy costs thanks to the installation of variable-speed drives (VSDs) and high efficiency motors by ABB.

The contract involved the supply of services and solutions from across the ABB group, as well as co-ordination with a number of other subcontractors. This included the supply and installation of five 690 V regenerative drives with active front-end supply units, as well as five 1200 kW, 6-pole, air-cooled motors.
Also supplied were two high performance pressure transmitters with remote diaphragms.
MORE FROM THIS COMPANY
- Online flowmeter selection tool
- Motor aids power storage
- ABB to demonstrate integrated automation capabilities at Automation UK
- Anti-jam software helps drive energy savings
- Flow and valve services explained
- Life cycle assessment service for drives and motors
- Extracting savings
- ABB extends CoriolisMaster family with two new compact options
- Bearing compass
- Videographic recorder
RELATED ARTICLES
- No related articles listed
OTHER ARTICLES IN THIS SECTION
















