
![]() |
Edward Lowton
Editor |
![]() ![]() |
ARTICLE
Savings for Tata Steel
26 January 2014
A fume extraction system at Tata Steel’s Aldwarke melting shop, in Rotherham is reported to be saving £570,000 a year on energy costs thanks to the installation of variable-speed drives (VSDs) and high efficiency motors by ABB.

The contract involved the supply of services and solutions from across the ABB group, as well as co-ordination with a number of other subcontractors. This included the supply and installation of five 690 V regenerative drives with active front-end supply units, as well as five 1200 kW, 6-pole, air-cooled motors.
Also supplied were two high performance pressure transmitters with remote diaphragms.
MORE FROM THIS COMPANY
- ABB secures major contract with Spirax Sarco
- Smart sensor monitors pumps
- Double benefit
- Quality, safety and efficiency on the rise for oven manufacturer
- Increased performance
- New network for drives and motors
- IE5 efficiency without rare earth magnets
- Digital twin technology cuts commissioning times
- Oil costs reduced
- Tips for optimum valve positioner performance
RELATED ARTICLES
- No related articles listed
OTHER ARTICLES IN THIS SECTION