|
|
Edward Lowton
Editor |
|
ARTICLE
Savings for Tata Steel
26 January 2014
A fume extraction system at Tata Steel’s Aldwarke melting shop, in Rotherham is reported to be saving £570,000 a year on energy costs thanks to the installation of variable-speed drives (VSDs) and high efficiency motors by ABB.

The contract involved the supply of services and solutions from across the ABB group, as well as co-ordination with a number of other subcontractors. This included the supply and installation of five 690 V regenerative drives with active front-end supply units, as well as five 1200 kW, 6-pole, air-cooled motors.
Also supplied were two high performance pressure transmitters with remote diaphragms.
MORE FROM THIS COMPANY
- Drive suited to mission-critical applications
- IE2 motor-drive package
- Steel producer boosts production with new multidrive
- ABB launches virtual technical assistance support service
- Keeps check of ammonia
- ABB application for pre-emptive maintenance
- New guide helps to simplify pressure transmitter selection
- Trunki manufacturer cuts energy costs
- Two pumps prove better than four
- ABB releases guide to six flowmeter technologies
RELATED ARTICLES
- No related articles listed
OTHER ARTICLES IN THIS SECTION
















