|
|
Edward Lowton
Editor |
|
| Home> | Production Engineering | >Component cleaning | >Finishing plant boosts capacity |
ARTICLE
Finishing plant boosts capacity
20 May 2014
Manufacturer of specialised containers for the offshore oil and gas industry, Mayfly Containers, has increased production capacity with the installation of new surface preparation and painting facilities from Hodge Clemco.

Part of a £1.8m investment the new finishing plant at the Derbyshire premises has increased potential throughput by 70%. Working closely with Hodge Clemco, Mayfly used its in-house capabilities to construct a self-contained blast room for surface preparation within a new production building.
In the 6.5m wide x 21m long x 5m high blast room, Hodge Clemco installed a high-performance dust extraction and air replenishment system and a media recovery system that minimises abrasive usage.
MORE FROM THIS COMPANY
- Blast cabinets upgrade aircraft maintenance facilities
- Automated finishing system
- Customised blast cabinet
- Customised cabinet upgrades armature repair
- Blast room enables a perfect finsh
- Upgrade to finishing facilities
- Finishing plant
- Blast-room boosts surface finishing standards
- Self-contained production rooms
- Low noise surface preparation
OTHER ARTICLES IN THIS SECTION
















