
![]() |
Edward Lowton
Editor |
![]() ![]() |
Home> | Efficient Maintenance | >Maintenance products | >Prepare pumps for winter |
Home> | Plant, Process & Control | >Pumps | >Prepare pumps for winter |
Prepare pumps for winter
20 August 2015
With winter not too far away, Andy Cruse of ERIKS pump division, calls on businesses to prepare and maintain pumping equipment now, to enhance productivity and ensure business continuity.

Cruse comments: "The summer months are an ideal time for facility managers to run pump checks and complete any necessary repairs, rather than waiting with baited breath as they switch them back on during the winter months.
"In fact, 95% of the cost of running a water pump is energy. However, with up to 60% of pumps in plant rooms and pumping operations being obsolete, energy wastage from ineffective heating systems, with spares almost impossible to source, is a cause of unnecessary expenditure in industrial facilities. It is therefore vital to ensure that pumping equipment is working efficiently before they are put into full time use during the colder weather.”
Cruse continues: "Having a proactive maintenance schedule in place during the summer month’s helps operations get back up and running much more quickly during the winter, while avoiding unnecessary and costly repairs.
"Factory managers should invest in a comprehensive audit that looks at the pumps, tests their performance and uses data logging to identify current energy use. After looking at operating hours, usage and motor size, the auditor can then identify the highest and lowest energy users, allowing those in charge to make an informed decision about which pumps to focus any maintenance works on initially.
"It’s also important to remember that if the decision is made that a pump requires replacement, there are key areas to consider over and above the age of the equipment. With an effective asset management programme and evaluation process in place, end users can make informed decisions about pump repair or replacement in terms of system efficiency and whole life costs, as well as the suitability of the site and operation for replacement.”
- The importance of prioritising PPE
- Going beyond the repairable asset - part 3
- Major Royal Navy contract win
- Social value in action: ERIKS and TfL keep London moving
- Win £5k design time and a Land Rover day with ERIKS
- Going beyond the repairable asset part #2
- Looking at the bigger picture
- How Weetabix and ERIKS eliminate downtime
- Cut your hose costs
- Time to pump up the planning