|
|
Edward Lowton
Editor |
|
| Home> | Plant, Process & Control | >Pumps | >Pumps delivered on a plate |
Pumps delivered on a plate
14 March 2019
With the growth of increasingly complex projects, offsite build provides a solution that helps overcome some of the challenges.

These pre-engineered solutions tick all the boxes in terms of the coordination of a range of elements from planning and design, through to fabrication, assembly of components, and all required testing.
Grundfos says it is seeing requests coming in from a range of areas, such as larger building projects, industrial solutions, as well as from the water industry. It says all of these can benefit from having packaged sets arrive on site complete with all the necessary pumps, piping, valves, instrumentation and controls.
Selecting a partner who has the capacity, knowledge, expertise as well as all the necessary accreditations to deliver all the stages within the process is key. Grundfos, for example, has a 12,000m2 manufacturing plant in Sunderland that, it says, is a recognised centre of manufacturing excellence, offering customers design, build, assembly, test and distribution from under one roof, creating a streamlined and very cost-effective option.
- Behind-the-scenes service at Wimbledon
- Energy challenge
- Pumps play their part at St Andrews
- e-place don't replace
- 10 out of 10 for the Grundfos Pump School
- One small change in boiler feed level control, one massive change for the better
- Reducing water
- Grundfos celebrates 75 pioneering years
- Pump firm scores in Russia
- Pump replacement simplified
















