
![]() |
Edward Lowton
Editor |
![]() ![]() |
Home> | Plant, Process & Control | >Pumps | >Pumps delivered on a plate |
Pumps delivered on a plate
14 March 2019
With the growth of increasingly complex projects, offsite build provides a solution that helps overcome some of the challenges.

These pre-engineered solutions tick all the boxes in terms of the coordination of a range of elements from planning and design, through to fabrication, assembly of components, and all required testing.
Grundfos says it is seeing requests coming in from a range of areas, such as larger building projects, industrial solutions, as well as from the water industry. It says all of these can benefit from having packaged sets arrive on site complete with all the necessary pumps, piping, valves, instrumentation and controls.
Selecting a partner who has the capacity, knowledge, expertise as well as all the necessary accreditations to deliver all the stages within the process is key. Grundfos, for example, has a 12,000m2 manufacturing plant in Sunderland that, it says, is a recognised centre of manufacturing excellence, offering customers design, build, assembly, test and distribution from under one roof, creating a streamlined and very cost-effective option.
- Teach yourself a lesson on pumps
- End-suction pump solutions
- Check up on your pump's health
- Evolving range of end-suction pumps
- Pump school re-opens
- Healthy boost to business
- Going beyond the pump
- Hydro Micro-E compact booster sets
- One small change in boiler feed level control, one massive change for the better
- Pump replacement simplified