|
|
Edward Lowton
Editor |
|
| Home> | Production Engineering | >Welding | >Bridge role for welding firm |
ARTICLE
Bridge role for welding firm
25 January 2013
The recently completed San Francisco-Oakland Bay Bridge mega project led by the American Bridge-Fluor joint venture and sub-contracted to Shanghai Zhenhua Heavy Industries Co (ZPMC) has been completed in Shanghai and

The recently completed San
Francisco-Oakland Bay Bridge
mega project led by the
American Bridge-Fluor joint
venture and sub-contracted
to Shanghai Zhenhua Heavy
Industries Co (ZPMC) has
been completed in Shanghai
and shipped to America.
During construction,
ZPMC experienced weldingrelated
issues that had to be
resolved before components
could be shipped to America.
ESAB China's welding engineers worked closely with other ESAB experts to run trials and to help introduce new welding procedures and consumables to resolve the welding issues.
ESAB China supplied 12 x 40ft containers of specialised welding wire called ESAB DualShield 70 Ultra Plus.
ESAB China's welding engineers worked closely with other ESAB experts to run trials and to help introduce new welding procedures and consumables to resolve the welding issues.
ESAB China supplied 12 x 40ft containers of specialised welding wire called ESAB DualShield 70 Ultra Plus.
MORE FROM THIS COMPANY
- Welding matters
- Cutting software
- Easy-to use, full featured welding machine
- ESAB launches new B2 filler metals line
- ESAB plasma 'four times faster' than oxy-fuel
- Gloves to suit all welding applications
- Unified platform seamlessly shares data
- Heavy-duty protection from welding fume
- Copper-free, seamless flux-cored wires
- ESAB launches inverter-based welding power source and wire feed systems
OTHER ARTICLES IN THIS SECTION
















