
![]() |
Edward Lowton
Editor |
![]() ![]() |
Home> | Production Engineering | >Welding | >Bridge role for welding firm |
ARTICLE
Bridge role for welding firm
25 January 2013
The recently completed San Francisco-Oakland Bay Bridge mega project led by the American Bridge-Fluor joint venture and sub-contracted to Shanghai Zhenhua Heavy Industries Co (ZPMC) has been completed in Shanghai and

The recently completed San
Francisco-Oakland Bay Bridge
mega project led by the
American Bridge-Fluor joint
venture and sub-contracted
to Shanghai Zhenhua Heavy
Industries Co (ZPMC) has
been completed in Shanghai
and shipped to America.
During construction,
ZPMC experienced weldingrelated
issues that had to be
resolved before components
could be shipped to America.
ESAB China's welding engineers worked closely with other ESAB experts to run trials and to help introduce new welding procedures and consumables to resolve the welding issues.
ESAB China supplied 12 x 40ft containers of specialised welding wire called ESAB DualShield 70 Ultra Plus.
ESAB China's welding engineers worked closely with other ESAB experts to run trials and to help introduce new welding procedures and consumables to resolve the welding issues.
ESAB China supplied 12 x 40ft containers of specialised welding wire called ESAB DualShield 70 Ultra Plus.
MORE FROM THIS COMPANY
- Website redesigned
- ESAB Europe Xpanse virtual event runs live from 27-29 April
- Welding machines for training
- Robust and reliable
- Plasma cutting machine
- ESAB plasma 'four times faster' than oxy-fuel
- Power in a compact format
- Endless wire cuts cost of welding
- Nickel-based consumables
- Power sources for automated plasma cutting
OTHER ARTICLES IN THIS SECTION