
![]() |
Edward Lowton
Editor |
![]() ![]() |
Home> | Premises management/maintenance | >HVAC | >Heating for JCB |
ARTICLE
Heating for JCB
25 January 2013
When JCB relocated to a new £40m factory on the outskirts of Uttoxeter, a state-of-the-art heating system was required.With a proven track record of heating large warehouses and production facilities, Nor-Ray-Vac's cont

When JCB relocated to a new £40m
factory on the outskirts of Uttoxeter,
a state-of-the-art heating system was
required.With a proven track record
of heating large warehouses and
production facilities, Nor-Ray-Vac's
continuous radiant tube heating
from AmbiRad was specified.
To achieve the blanket heat coverage required, Nor-Ray-Vac provided 59 x 46LR burners and six discharge fans.With rapid warm up times, the series of 46LR burners provides a comfortable working temperature within five to ten minutes of start up.
Designed to provide uniform heat coverage across the entire factory floor, the Nor-Ray-Vac system also caters for distinctly specified zones.
To achieve the blanket heat coverage required, Nor-Ray-Vac provided 59 x 46LR burners and six discharge fans.With rapid warm up times, the series of 46LR burners provides a comfortable working temperature within five to ten minutes of start up.
Designed to provide uniform heat coverage across the entire factory floor, the Nor-Ray-Vac system also caters for distinctly specified zones.
MORE FROM THIS COMPANY
- AmbiRad delivers a lecture in heating
- Maintain internal climate
- Stop energy loss at the door
- Engineered heating solutions
- Cool solution for Cosworth factories
- Stop energy loss at the door
- Look at lifetime costs
- Thermal destratification - not just an after thought
- Making tracks in energy efficient heating
- Latest brochures
OTHER ARTICLES IN THIS SECTION