
![]() |
Edward Lowton
Editor |
![]() ![]() |
Home> | Handling and Storing | >Lifting equipment | >The chips are down |
ARTICLE
The chips are down
25 January 2013
Demag Cranes has installed a fully automated crane system at a combined cooling, heating and power (CCHP) plant, part of Sky's new 23,000m2 studio complex in Osterley,West London. Wood chip is delivered to the CCHP p

Demag Cranes has installed a fully
automated crane system at a
combined cooling, heating and
power (CCHP) plant, part of Sky's
new 23,000m2 studio complex in
Osterley,West London.
Wood chip is delivered to the CCHP plant by vehicles and tipped into a sunken input area.When sensors indicate that biomass levels require replenishment, the Demag Cranes' system automatically lifts biomass from the input area and deposits it into the silo store.
Demag Cranes installed a 7.8m span overhead travelling crane, incorporating a DR-Pro electric wire rope hoist, rated at 6.3t SWL.
Wood chip is delivered to the CCHP plant by vehicles and tipped into a sunken input area.When sensors indicate that biomass levels require replenishment, the Demag Cranes' system automatically lifts biomass from the input area and deposits it into the silo store.
Demag Cranes installed a 7.8m span overhead travelling crane, incorporating a DR-Pro electric wire rope hoist, rated at 6.3t SWL.
MORE FROM THIS COMPANY
OTHER ARTICLES IN THIS SECTION