
![]() |
Edward Lowton
Editor |
![]() ![]() |
Home> | Plant, Process & Control | >Pneumatic equipment | >Compressors cut energy bills for vernacare |
ARTICLE
Compressors cut energy bills for vernacare
04 March 2013
Thorite has supplied and installed two compressors at Bolton-based human waste management specialist, Vernacare. The compressors offer a combination of reliability and energy-saving characteristics and comprise an HPC 90kW fixed speed CSDX162, and HPC 110kW variable speed model, DSD202.

Thorite has supplied and
installed two compressors at
Bolton-based human waste
management specialist,
Vernacare. The compressors
offer a combination of
reliability and energy-saving
characteristics and comprise
an HPC 90kW fixed speed
CSDX162, and HPC 110kW
variable speed model, DSD202.
Located in the main production plant, the machines are currently saving Vernacare over 6% in energy use while providing trouble-free performance.
Graeme Topping, Vernacare's engineering manager said: "The new HPC compressors have performed superbly and achieved significant energy savings.
We are now benefiting from lower energy bills, reduced service costs and outstanding machine reliability. Having agreed a 5 year 'total care' service contract I'm sure this situation is set to continue."
Located in the main production plant, the machines are currently saving Vernacare over 6% in energy use while providing trouble-free performance.
Graeme Topping, Vernacare's engineering manager said: "The new HPC compressors have performed superbly and achieved significant energy savings.
We are now benefiting from lower energy bills, reduced service costs and outstanding machine reliability. Having agreed a 5 year 'total care' service contract I'm sure this situation is set to continue."
MORE FROM THIS COMPANY
OTHER ARTICLES IN THIS SECTION