KING’S BOILER PLANT FOR ANAEROBIC DIGESTION

19 July 2013

KING’S BOILER HIRE tick all the boxes when it comes to helping farmers and growers meet their green credentials and generate electricity by anaerobic digestion process.

KINGS work closely with UK farmers, growers, water companies and local authorities and others who are joining in with the latest Government drive to increase the generation of renewable energy.

King’s Boiler Hire provide temporary packaged boiler units which are particularly suitable for this purpose and have been working with clients around the UK on numerous AD projects.

As John Fisher, KING’s AD specialist explains:
"we are familiar with the specific heating requirements of AD plants and understand the importance of reliable equipment as the biogas process begins. Any drop in temperature at this point can seriously prolong the reaction time and add extra costs to the commissioning process”.

The anaerobic digestion process requires an initial heat source to gradually raise the temperature of the digestate. King’s temporary boiler units are the perfect, cost effective solution for this. Heating is required for the first 12-16 weeks, after which the process is self-maintaining by re-circulating the water from the gas engine.

King’s nationwide team of engineers and 24hour HotLine developed specifically for our clients, ensures the heating time is kept at optimum performance. The gas generated can be exported direct to the gas grid and in these cases a permanent source would be required. KINGS can offer competitively priced, fully refurbished, secondhand boilerplant for purchase from stock. So whether you are looking to hire or buy, Kings are here to help.

KINGS also supply boilers to gasification plants for drying the process fuel which produces a more homogeneous source, improving the reliability of the gasification process. KING’S hire team work with these sites to ensure the boilerplant matches the heat exchanger to give optimum efficiency.

To discuss AD or gasification with John Fisher and the team at KINGS Call +44 (0) 1638 712328 (East Anglia) or +44 (0) 1992 451629 (Nationwide).
 